RFI 》request for information
CRFI》contractor request for inspection
MIR》material inspection request
IFC》issue for construction
EI》engineer instruction
SD》 shop drawing
ASBD》as built drawing
JSI》job site instruction
ITP》inspection test plan
PAC..provisional acceptance certificate
FAC final acceptance certificate
ITL = Independent Testing Laboratory
Cpi =cost performance index
SI = SITE INSTRUCTIONS
TQ= TECHNICAL QUREY
LPO: local purchase order
*ITP: inspection test plan
*TPI:Third party inspection
*LOI: letter of intent
*C.O: confirmation order
*MAS: Material approval submittal
*L/C: letter of credit
*CDC: current date cheque
*PDC: post dated cheque
CRFI》contractor request for inspection
MIR》material inspection request
IFC》issue for construction
EI》engineer instruction
SD》 shop drawing
ASBD》as built drawing
JSI》job site instruction
ITP》inspection test plan
PAC..provisional acceptance certificate
FAC final acceptance certificate
ITL = Independent Testing Laboratory
Cpi =cost performance index
SI = SITE INSTRUCTIONS
TQ= TECHNICAL QUREY
LPO: local purchase order
*ITP: inspection test plan
*TPI:Third party inspection
*LOI: letter of intent
*C.O: confirmation order
*MAS: Material approval submittal
*L/C: letter of credit
*CDC: current date cheque
*PDC: post dated cheque
Inspection Plan =IP
Test Sample Request =TSR
Work Request=WR
Material Issue Voucher =MIV
site material requisition=SMR
Field Inspection Notice =FIN
Inspection and Test Plans =ITP
Piping and instrumentation diagram=P&ID
NCR = non conformance report.
RFI = Request for information.
CL = Check list or IR = Inspection request.
MDN = material delivery note.
JSI = Job site instructions.
SR = Safety report.
Tr = Transmittal.
TCS = technical comparison sheet.
CCS = Cost comparison sheet
.QA/QC
Quality Assurance Quality Control
QS
Quantity surveyor
BOQ
Bill Of Quantity
LOI
Letter Of Intent
PQP
Project quality plan
ITP
Inspection test plan
HSEP
Health safety and environment plan
JV
Join venture
PB
Performance bond
TB
Tender bond
CAR
Contractor all risk
RFMA = Request for material approval
RFQ = Request for quotation
RFV = Request for variation
VO = Variation order
SF = Submittal form
TQ = Technical query
DSR = Daily site report
MOM = Minutes of meeting
SWI = Site work instructions
PMI = Project manager instructions
RAS = Request for alternatives or substitution
MDC = Material deliveries checklist
RFI = Request for inspection
NCR = Non conformance report
SVN = Safety Violation notice
-------------------------------------------------------------------------------